The Street Maintenance Program includes a map showing the streets targeted for resurfacing between 2024 to 2028. The program can be viewed here. It also includes a budget and an assessment of current street conditions.
Sidewalk conditions are not regularly inventoried Citywide; however, a list is kept of sidewalk hazards that are called in or noted by City staff. The Engineering Division advances sidewalk repair work based on this list and available funding. Less severe sidewalk hazards called in may be ground smooth or ramped with asphalt by Public Works Streets Division.
Chronic pothole locations may be called into the Streets Division for more immediate attention by filling with temporary patch mix until a permanent repair can be made.